Small assembly inventory

Plan materials and record partial builds without implementing MRP.

KnownStock supports simple, repeatable transformation where the main need is correct component and finished-goods inventory.

  • No card required
  • Every feature included
  • Desktop, tablet and phone
Simple components arranged beside one finished assembled item
Simple components arranged beside one finished assembled item

A real product workflow

See the facts behind the stock figure.

This example uses fields and states that exist in KnownStock. It is a clear HTML product view, not a fabricated customer screenshot.

The operating model

Keep one clear stock record across every place where the team works.

Office, warehouse and mobile colleagues work from the same inventory record, while neighbouring business processes remain in the systems built for them.

  • Component stores and optional workbench locations
  • Confirmed production orders with planned material
  • Partial runs and remaining quantity
  • Usable, quarantined or rejected results

Materials

Availability and replenishment

Expose shortages before converting a suggestion to a draft.

See replenishment

Value

Operational weighted average

Carry the real component consumption value into output.

Understand cost

A typical day

From the first question to a movement everyone can explain.

A team confirms an order for 50 finished kits. The recipe version used for that order fixes the required components and makes the expected result visible. Today’s run completes 20 kits, consumes only the actual quantities and receives usable output. The remaining 30 stay planned for a later run.

When KnownStock fits

A strong choice when inventory is the shared operational problem.

  • Recipes are simple and repeatable
  • Inventory accuracy matters more than machine scheduling
  • Partial output is a normal daily event
  • Labour and overhead are handled outside KnownStock

When you need more

Add or choose a specialist system when the job extends beyond focused inventory operations.

  • MRP, MES, routing, capacity or WIP
  • Machine, labour or overhead costing
  • Complex by-products or process genealogy
  • Regulated quality or traceability

Ready for a verifiable first movement

Start with one item, one warehouse and one quantity you can explain.

Create a workspace without a card. Use removable sample data or enter one real record, then follow the practical manual at your own pace.